• Share
  • Cart

Like to design your own projects?
This unique set of downloadable graphs, grids, and rulers give you the basic templates you need to hand-draw your own schematics, cutting diagrams, and 3D illustrations.

6-Plans Combo

EZ Ruler - How it Works
Conventional graph paper works reasonably well for sketching out project ideas. Unfortunately, counting off squares can get tedious. My printable EZ Ruler with 96 tick marks lets you draw 8-foot boards and full sheets of plywood - all in 1/10 scale on letter size paper. Printing the ruler on 65# stock paper makes a strong, durable ruler that you can cut to size with scissors or a utility knife.

Plywood Cutting Diagram
I'm amazed at how much plywood goes to waste when building a project. My EZ plywood grid comes to the rescue here - letting you see exactly how much space is available on a 4x8 sheet. If it doesn't fit - simply draw the shape in a better location on the board.

What's in Andy's Art Box?

 

2x4 & 2x6 Lumber Cutting Diagrams
I tend to underestimate how many boards I need for a project, and that usually means a gas-wasting return trip to the lumber store. A cutting diagram like this helps you narrow down exactly what's needed for the project at hand - before you leave the house.

Magic Drawing Cube
Magic drawing cube lets you draw your project ideas in 3D - even if you’ve never been very good at perspective. Start at one corner with your pencil and follow the guidelines to reach the intersecting points for the top, sides, and back. No rulers or drawing tools needed.

   

Project Shopping Checklist
I used to take a pile of scribbled notes to the hardware store when it was time to buy supplies. Not anymore. This neat and tidy checklist gets your brain better organized - and helps you avoid buying stuff you don't need.

Let me know what you think of my project planner.

   
 
   
 

 

 
wood project planner slide show
Closer Look
 

EZ Graph Paper
 

Plywood Planner
 
Magic Drawing Cube
 

2x4 Blank Grid
 

2x6 Blank Grid
 
EZ Shopping List
  • ©EZwoodshop.com